2 EMDX demos lead T411 through Akron after a considerable delay due to an eastbound autorack pulling a drawbar and having to wait for 7 other eastbounds to run around it.
Eastbound loads make their way down the Northern Sub working past ZK Cabin and under the 2 track cantilever.